Projects

City of Laredo 1 Million Gallon Elevated Water Storage Tank

03/30/2009

Vickers Inspection Delivered day to day field inspection and QC analysis of the ongoing painting and coating operations. Vickers inspection also provides support in the role of failure analysis of existing coating system.  Vickers Inspection personnel documented daily coating inspection reports which were then submitted to the project engineer in report at the end of the project


Similar Works
1-IMG_8834-001 SPX Flow Technology

Enbridge pipeline Inc. Houston, TX 77065 48 inch gate valve assemblies On-site coating inspection during application of […]

12-IMG_4556_resize Naval Air Station Corpus Christi, Texas

NAS-P 353 Aviation Training Facilities Vickers Inspection personnel provided independent third party QA/QC inspection for the coating […]

02-Good Camera Enbridge Project No. 701-94114OP12100 121 (20) Enbridge Onshore Coatings

October 12, 2011 Enbridge-Stingray Sta701. Johnson Bayou, LA. SOS, Train A Low Pressure, High Pressure, and Train […]